Skip to main content

ERM Gap Analysis

Score Your ERM Program: Fully, Partially, or Not in Place

An element-by-element gap analysis that turns a vague sense of risk into a documented remediation log with named owners.

You run or inherited an existing ERM program, and the honest answer to "where does it actually stand?" is that you are not sure. Policies exist, a risk register exists, controls are named, but you cannot separate what is operating in substance from what is only documented. An enterprise risk management framework is a program, not a document, and organizations that treat it as a documentation exercise often fail audits and produce governance outputs disconnected from operational reality. You need an objective read before an examiner gives you one.

9
structural ERM domains the checklist scores, from governance foundations through audit readiness.
3
scoring states applied to every element: fully in place, partially in place, or not in place.
31
pages of sequenced, section-by-section assessment criteria.
12 months
the review window auditors expect: a register with no updates raises questions about whether the program operates or is merely maintained on paper.

Free Download

Get instant access to the checklist

A practical, section-by-section self-assessment tool.
  • The fully / partially / not-in-place scoring method
  • A gap log with named owners you can take to the board
  • Section-by-section checklists across all nine ERM domains
The ERM Framework Checklist

The Enterprise Risk Management Framework Checklist

A design and implementation reference for CISOs, risk managers, and GRC leaders.

Verifying you're human...

01
Score each element
Rate every item as fully in place, partially in place, or not in place against observable evidence.
02
Log the gaps
Record every partial or missing item as a formal gap with a named owner and a remediation timeline.
03
Map to the lines of defense
Assign each element to the correct line, surfacing ownership that is consolidated or ambiguous.
04
Work in sequence
Confirm foundations before assessment is attempted - the sequencing reflects real program maturity dependencies.
05
Carry it into reporting
Take the completed gap log into board risk committee and internal audit reporting as a primary artifact.
INCLUDED IN THE CHECKLIST
The fully / partially / not-in-place scoring method applied to every element
How to log gaps with named owners and remediation timelines as a board artifact
Section-by-section checklists across all nine ERM domains
Where ownership is consolidated or ambiguous - itself a governance finding
How to surface control gaps and redundancies in your control mapping

You can name exactly where the program is thin

Instead of a general unease, you leave with a precise list of which elements are partial, unowned, or absent.

You walk into an audit with the evidence already assembled

The checklist names the specific documents, fields, and evidence an examiner will request, so there is no last-minute reconstruction.

You can defend your remediation priorities

Each gap carries an owner and a timeline, giving the board a credible, trackable plan rather than a static declaration.

You stop confusing documentation with operating substance

Scoring against observable execution separates what works from what merely exists on paper.

COSO ERM 2017

Grounded in COSO Enterprise Risk Management: Integrating with Strategy and Performance (2017).

ISO 31000:2018

References ISO 31000:2018 Risk Management Guidelines.

NIST SP 800-39 / 800-37

References NIST SP 800-39 and 800-37 for technology and information risk integration.

IIA Three Lines Model

Built on the IIA Three Lines Model (2020) for ownership and accountability.

Regulatory regimes

Addresses SEC cybersecurity disclosure rules (Regulation S-K Item 106), SOX, HIPAA, DORA, Basel III, DFAST, and SREP.

Practical scoring tools

Includes illustrative likelihood and impact scales, a 5x5 heat map scoring logic, KRI threshold tiers, and a sample control mapping table.

Yes. Gap analysis against an existing program is one of three supported use cases, alongside initial design and audit readiness. You score each element where it stands today rather than building from a blank page.

Get an objective read on where your program really stands

Score your ERM program before an examiner does

A practical, section-by-section self-assessment tool.